Bow Pod Direct Attach Build and Test Guide
- 1. Overview
- 2. Bow Pod DA systems
- 3. Bow Pod DA configurations
- 4. Physical mounting
- 4.1. Preparing the rack
- 4.1.1. Rail distance
- 4.1.2. Unpacking the rack
- 4.1.3. Removing the side panels and doors
- 4.1.4. Removing the vertical accessory channels
- 4.1.5. Adjusting the rear accessory channels
- 4.1.6. Adjusting the rear vertical rails
- 4.1.7. Adjusting the front vertical rails
- 4.1.8. Installing the rack rails
- 4.1.9. Installing PDU brackets
- 4.2. Installing the equipment
- 4.3. Cabling the system
- 4.4. Power cabling
- 4.5. Completing the rack
- 4.1. Preparing the rack
- 5. Server requirements
- 6. System platform software configuration
- 6.1. Create an account for Bow-2000 administration
- 6.2. Download the Bow-2000 system software release
- 6.3. System platform installation and configuration
- 6.3.1. Installing the Bow-2000 software release
- 6.3.2. Checklist before running the Bow Pod DA install script
- 6.3.3. System configuration including network setup
- 6.3.4. Output from bundle install script
- 6.3.5. Example output from Bow Pod DA install script
- 6.3.6. Running Bow Pod DA install in non-interactive mode
- 6.3.7. Discovering network interfaces for non-interactive mode
- 6.4. Bow-2000 maintenance, management and control
- 7. System hardware testing
- 8. Platform system OS configuration (reference only)
- 9. Revision history
- 10. Safety and compliance
- 11. Trademarks & copyright